robling_t: (Default)
( Feb. 19th, 2015 11:39 pm)
The blanket project is ticking right along, and at the end of week seven we had another Executive Decision, in that that narrow two-colour part of the needlewards swatch here took longer to knit than did the entirety of the single-colour variation that I switched to after looking up at the clock and saying "screw this". If I should run into this stitch again as a plain one-colour stitch later I'll knit one of the unused stitches from Feb. 29 or Dec. 31 as a penalty-lap instead.

Also, Snip would like everyone to know that it is very cold out and the Management should be baking more for the sake of her comfort. That is all.
.